Home 📰 News — DHA, Tax & MarketFarmhousesDefence View Farms (DVF)Golf Residencia FarmsChaudhary FarmsIVY FarmsTheater FarmsCountry HomesApartmentsAskari 10 — Tower 3Askari 10 — Tower 5Askari HeightsDHACommercialOne Central — Mughal BazarOne Central DHA — PlotsIndustrialIndustrial ValleyHousing ProjectsBedian Modern VillageRoyal Residencia🏘 DHA Plots — Phase & Block Wise🏠 DHA Houses — Prices By Phase📊 DHA File Rates — Phase Wise🧱 Build Your House — Cost, Rules & Elevations🧾 DHA Transfer Charges Calculator🗺 DHA Maps — Download All Phases Overseas Pakistanis Gallery All Links & Channels 💬 WhatsApp Us
Home / DHA / Build / Cost

What It Costs To Build A House In DHA Lahore

Real construction rates for 16 August 2026, by plot size and quality. Every figure is per square foot of covered area — never plot area.

The mistake that costs people lakhs. A 1 kanal plot is 4,500 sq ft of land, but a double-storey house on it is around 6,000 sq ft of covered area. If someone quotes you a per-square-foot rate against the plot size, the real bill will land roughly 40% higher than you were told. Always ask which area the rate is against.
Estimated turnkey cost
—
Covered area, typical double storey—
Grey structure—
Finishing—
Rate per sq ft covered—

Get a real quote on WhatsApp
Where these numbers come from. Eight Lahore builders and Zameen's own calculator, compiled 16 August 2026. Note that Zameen's calculator returns roughly 4,500–4,700 per sq ft turnkey while Lahore builders quote 6,500–8,500 for the same house. Both are honest — Zameen prices materials and site labour at basic specification, builders add margin, design, supervision, wastage and DHA-grade finishing. We publish the builder figure because that is what you will actually be asked to pay.

What the material rates are doing

MaterialRateMovement
Cement — 50 kg bagPKR 1,400 – 1,610up 8–10% since early 2026
Steel / sariaPKR 255 – 265 per kgup 12–15%; jumped in July, now flat
Bricks — A-grade (awwal)PKR 17,000 – 22,000 per 1,000steady
Sand — Chenab (concrete)PKR 55 – 75 per cftvaries by pit and haulage
Crush / bajriPKR 75 – 100 per cftvaries by source
Skilled labour (mason)PKR 2,500 – 3,500 per dayPunjab notified 2,000 in July
Cement is up 8–10% and steel 12–15% since early 2026. Steel jumped 10,000–15,000 per ton in July and has since flattened. These move around 10% a quarter — we refresh this page quarterly, same as the file rates.

Grey structure — what you get and what you don't

Included in grey

  • Excavation and foundation
  • Masonry and RCC — slabs, beams, columns
  • Staircase to plaster level
  • Internal and external plaster
  • Underground sewerage
  • PPRC water piping
  • Electrical conduiting
  • Roof waterproofing
  • Window grills
  • Boundary wall with gate columns

Not included — this is what finishing buys

  • Flooring and tiles
  • Paint and wall finishes
  • Ceilings and false ceilings
  • Doors and windows
  • Sanitary and electrical fixtures
  • Lighting
  • Kitchen and wardrobe cabinetry
  • Exterior cladding and elevation finish
  • Landscaping
Basements cost about a third more per square foot — PKR 4,000–4,600 against 2,900–3,300 above ground. That premium applies to the basement's own area. On a difficult water table, dewatering and retaining walls can push it further — get the soil test done before anyone quotes you.